Laserfiche WebLink
Prior to mining of Pazcel C, any structures will be removed and/or demolished, safety <br />fence will be installed and overburden material will be removed and stockpiled on Area I <br />i for use during reclamation. <br />Timetable of Events <br />• <br />L J <br />The following is a table consisting of the proposed phases on mining, including the <br />approximate dates and area for each phase. <br />PHASES DATES ACTION DESCRIPTION <br />I June 2003 Clearing and Fencing Fencing, removal of overburden, removal of <br /> structures. <br /> June 2003 to Construct slurry walls, beginning with Parcel <br />II Dec. 2003 Slurry Walls B then Parcels A ,C and D combined, <br /> including cut across wall. <br />III June 2003 to Continue Mining Parcels A and Completion of Wet Mine Parcels A and B <br /> Dec. 2003 B per existing permit <br /> Dec. 2003 to Dewater Area I by pumping into Area II and <br />IV June 2004 Dewater Area I and Dry Mine dry mine to completion, stockpiling material <br /> on Area II <br /> June 2004 to Reclaim Area I slopes, construct access <br />V Dec. 2004 Complete Area I reservoir roadways, pump station, regrade slopes, and <br /> establish vegetation. <br />VI June, 2004 to Dewater and Mine Areas II and Dewater by pumping/draining water into Area <br /> June 2009 III I and continue to mine to completion <br /> June 2009 to Construct access roadways and pump <br />VII Dec 2009 Reclamation station; regrade slopes, stabilize shoreline <br /> and establish vegetation <br />Brannan Sand & Gravel Mining Application August 2003 <br />X:\1440000.a11\1465701\Word\ReportslPemiit Amedment-12-11-03.doc <br />