My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV104120
DRMS
>
Back File Migration
>
Revision
>
REV104120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:15:13 AM
Creation date
11/22/2007 1:13:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
7/26/2004
Doc Name
Bond Release Application
From
Mountain Coal Company
To
DMG
Type & Sequence
SL2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JIIL-15-04 14:49 FROpI-Colorado Division of Ninarals i Geala9y +13036663567 <br />• Task Description <br />T-106 P.003/003 f-990 <br />Hours Direc: Cost <br />042 Sea) Mine Entries (Lone Pine Portals) 50 $ <br />43b Seal and Plug All Boreholes 172 $ <br />43c Seal and Piug All Boreholes 6 $ <br />44c Demolish and Remove All Structures 20 $ <br />44d Demolish and Remove All Structures 60 $ <br />44e Demolish and Remove All Stuuctures 30 $ <br />050 Rip Substation Road 0.1 $ <br />051 Regrade Main Access Road to Substation 2,24 $ <br />072 Baekfill Lone Pine Guich Fan Bench 63.57 $ <br />073 Rip Lone Pine Gulch fan Pad and Staging Area 1,D8 $ <br />067 Reconstruct Road Through Lone Pine GuIGt Fan Bench 0.24 $ <br />088 Rip Road Section to Be Reclaimed at Lane Pine Fan 0.18 $ <br />095 Backfiil Road Section to Be Reclaimed at Lone Pine Gulch 0.24 $ <br />096 Haul Material to Backfill Lone Pine Gulch Portais 21.22 $ <br />157 Haul Substation Backfill Material 9.46 $ <br />205 Rip Pads and Roads Associated with Minor Revision 270 4.52 $ <br />206 Regrade Drill Pads and Roads Assocated with Minor Revision 270 12.15 $ <br />Total Direct Costs <br />INDIRECT COSTS <br />20,668.00 <br />3.1,341.00 <br />x.,463.00 <br />1'1,474.00 <br />5'i,835.00 <br />1:;,791.00 <br />21.00 <br />'I ,587.00 <br />4'„972.00 <br />804.00 <br />169.00 <br />134.00 <br />169.00 <br />1 x.340.00 <br />5,869.00 <br />:],354.00 <br />3, 593.00 <br />453.D0 S 271,584.00 <br />Liability Insurance at 1.55% of Direct Costs $ x,209,55 <br />• Performance Bond at 1.05% of Direct Costs $ ',851.63 <br />Job Superintendant (50% of total Job hours at $35.OOlhour) $ 7,927,50 <br />Profit at 10.00% of Direct Costs $ 2",158,40 <br />Total Overhead and Profit $ a?,147.08 <br />Contract Amount (Direct Costs + Overhead and Profit) $ 'x13,731.08 <br />Engineering Work antllor Contract/Bid Preparation at 4.25% of Contract $ 13,333.57 <br />ReGamation Management andlor Administration at 3.25% of Contract $ 10,196.26 <br />TOTAL BOND AMOUNT $ 337,260.92 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.