Laserfiche WebLink
<br />-did BLM establish site specific visual resource objectives? <br />Reclamation and Compliance <br />-what is the total reclamation cost? <br />-will there be a reclamation bond? <br />-who will oversee the reclamation? <br />-will a BLM representative be present? <br />-is the County allowed to remove overburden? <br />-when will the livestock fence be installed? <br />-EA states all surface disturbance will be monitored by BLM and <br />Colorado DMG, please explain how BLM will monitor operation. "In order to effectively use <br />your available human and monitoring resources" when BLM is 1.5 hours away. <br />Hazardous Materials <br />-how did the BLM come to the decision that no hazardous wastes would be used? Site specific. <br />-gas and oil from machinery are hazardous. <br />-is the County allowed to dump foreign or toxic materials in the permit area? <br />