Laserfiche WebLink
1 %~ <br />rRECEIVED <br />ASSOC11tt'S <br />December 3, 2002 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />DEC t 22002 <br />Golder Associates Inc. Division of Minerals and Geology <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 6: November 10 through November 30, 2002 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVb and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of November <br />100i through November 300', 2002. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 7° F to 39° F, and highs ranged from 28° F to 57° F. Snow was recorded <br />on November 110i, 150', and 240', 2002. Weather observations were made on all twenty-one days of <br />this three week reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVb and <br />c construction. Ames conducted Phase IVb and c construction activities on twenty days of this twenty- <br />one day reporting period (November 110i through November 300'). <br />Phase IVb <br />Poly-Flex continued deployment of 100-mil SST LLDPE geomembrane, 100-mil smooth LLDPE <br />geomembrane, and 100-mil double-sided textured (DST) LLDPE geomembrane in Phase IVb. Poly- <br />Flex deployed 100-mil SST LLDPE geomembrane over an area of 32,985 square feet, deployed 100- <br />mil smooth LLDPE geomembrane over an area of 142,919 square feet, and deployed 100-mil DST <br />LLDPE geomembrane over an azea of 42,307 square feet in Phase IVb during this reporting period. <br />Geomembrane panels L513 through L558 and M467 through M512 were deployed, seamed, and tested <br />by Poly-Flex Destructive fusion seam samples DF-130 through DF-152b were marked, removed, and <br />