My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV103871
DRMS
>
Back File Migration
>
Revision
>
REV103871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:14:50 AM
Creation date
11/22/2007 1:11:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Revision
Doc Date
8/27/1985
Doc Name
OSM INITITAL REVIEW OF MINE PLAN MODIFICATION
From
OSM
To
MLRD
Type & Sequence
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />United States Department of the I~t~.r,ia~ <br />IN REPS 1' <br />REFER TU: <br />4121-17 <br />D-052501 <br />(7-123) <br />BUREAU OF lANO MANAGEMENT <br />Montrose District office !~^5 ~•-u 19 '-~ 8 3$ <br />2465 South Townsend <br />Montrose, Colorado 81401~~=~'- --" -~~ <br />RI16 1 ~ Asa; <br /> <br />Memorandum <br />To: <br />OSM Senior Project Manager, Weatera Technical Center, Office of <br />Surface Mining <br />From: District Manager <br />Subject: Mine Plaa Revision, Beat No. 3 Miae, Bear Coal Company <br />This office has reviewed the subject permit revision dated July 11, 1985, for <br />completeness and technical adequacy. The proposed mine plan, which relied on <br />immediate permit approval and lease reassignment for Bear to continue <br />development to the west onto Federal lease C-0117192, is now outdated. Bear <br />Coal has had to abandon the 1-West entries and is instead eztending the main . <br />entries south to develop the 2-West panels. Therefore, the following sections <br />of the mine plan need revision: <br />1. Map 9, Mine Plan, will need to be re-drawn to indicate the change Sa <br />mining sequence. All tent in the revision referring to, or <br />describing, the mine plan ar sequencing will likewise need to be <br />updated to Bear's current mine plan. <br />2. A sketch of typical panel recovery showing the sequence of <br />development and retreat. Panel recovery on the submitted Map 9 is <br />too vague and does not accurately represent Bear's current panel <br />recovery system. <br />The remainder of the revision appears complete and technically adequate. <br />r <br />~. <br />
The URL can be used to link to this page
Your browser does not support the video tag.