Laserfiche WebLink
San Luis Projec( <br />• <br />E.i SCOPE OF DOCUMENT <br />These technical specifications comprise the Specifications for construction oi( the diversion <br />channel system at Waste Rock Pile `C' of the San Luis Mine. <br />The Design Drawings referred to in these Specifications form a necessary component of the <br />Specifications. <br />E.1.2 Definitions <br />For these Specifications, Owner is referred to as Battle Mountain Resources, In~. (BMRI) with <br />overall responsibility for construction, operation, closure, and reclamation. i <br />The Contractor is defined as the group (or groups) selected by BMRI and sponsible for <br />conducting the work tasks outlined in Specification Section E.1.3 under the d' ection of and <br />under contract with BMRI. <br />The Field Engineer is defined as the person appointed by BMRI responsible for 'nspection and <br />Quality Assurance (QA) testing of construction work to ensure that facilities are constructed as <br />outlined in these Specifications. <br />• The Professional Engineer is defined as a Professional Engineer appointed by BM with current <br />registration in Colorado responsible for ensuring that construction work and insp ction and QA <br />testing of construction is conducted according to these Specifications and the inten of the design. <br />E.1.3 Scope of Work <br />The work outlined in these Specifications consists of execution of the following t~sks associated <br />with construction of the facilities. <br />• Excavation of the diversion channels. <br />• Installation of the filter fabric and geosynthetic liner (GCL). <br />• Installation/placement of riprap and grouted riprap in steeply sloped aze~s <br />E.1.4 Applicable Regulations and Standards <br />I <br />The work shall conform to applicable Federal, State, and County regulations. Test ng procedures <br />shall conform to applicable ASTM standards, as documented in the edition of st Bards in force <br />at the start of work. I <br />• E.1.5 Inspection and Quality Assurance <br />Inspection of all construction activities and quality assurance (QA) testing ou fined in these <br />Specifications shall be conducted by the Field Engineer (and approved assist is as needed) <br />Bat(!e Ffauniain Resources, Inc. Fiw! hepherd ~tfif(er, fnc. <br />p: vaote~n..rs~rhipc.t.k.~ E-1 January 2000 <br />