My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV103790
DRMS
>
Back File Migration
>
Revision
>
REV103790
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:14:43 AM
Creation date
11/22/2007 1:10:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
7/11/1994
Doc Name
AMENDED PERMIT COLO WASTEWATER DISCHARGE PERMIT SYSTEMS PN CO-0000132 SOMERSET MINING CO SOMERSET MI
From
CDOH
To
SOMERSET MINING CO SOMERSET MINE & SANBORN MINE
Type & Sequence
MR27
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ~ I <br />Page lg of 19 <br />Permit No. CO-0000132 <br />• <br />B. MONITORING REQUIREMENTS <br />4, Acute WET Testine-Outfall 011 (continued) <br />(b) Failure of Test and Division Notification <br />An acute WET test is failed whenever the LCSa, which represents an estimate of <br />the effluent concentration which is lethal to SOX of the test organisms in the <br />time period prescribed by the test, is found to be less than or equal to 100X <br />effluent. The permittee must provide written notification of the failure of a <br />WET test to the Division, along with a statement as to whether the Preliminary <br />Toxicity Incident ("PTI")/Toxicity Identification Evaluation ("TIE") <br />investigation or accelerated testing is being performed (see next section). <br />Notification must be received by the Division within 14 calendar days of the <br />demonstration of acute WET in the routine required test. "Demonstration" for <br />the purposes of Parts I.B.4(b),(c),(d) and (f) means no later than the last day <br />of the laboratory test. <br />(c) Automatic Compliance Schedule Upon Failure of Test <br />If a routine acute WET test is failed, regardless of whether the limit is in <br />effect, the following automatic compliance schedule shall apply. As part of <br />this the permittee shall either: <br />• (i) proceed to conduct the PTI/TIE investigation as described in Part <br />I.B.4,(d), or <br />(ii) conduct accelerated testing using the single species found to be more <br />sensitive. <br />If accelerated testing is being performed, the permittee shall provide written <br />notification of the results within 14 calendar days of completion of the <br />"Pattern of Toxicity"/"No Toxicity" demonstration. Testing will be at least <br />once every two weeks for up to five tests until 1) two consecutive tests fail or <br />three of five tests fail, in which case a pattern of toxicity has been <br />demonstrated or, 2) two consecutive tests pass or three of five tests pass, in <br />which case no pattern of toxicity has been found. If no pattern of toxicity is <br />found the toxicity episode is considered to be ended and routine testing is to <br />resume. If a pattern of toxicity is found, a PTI/TIE investigation is to be <br />performed. If a pattern of toxicity is not demonstrated but a significant level <br />of erratic toxicity is found, the Division may require an increased frequency of <br />routine monitoring or some other modified approach. <br />(d) PTI TIE <br />The results of the PTI/TIE investigation are to be received by the Division <br />within 120 days of the demonstration of acute WET in the routine test, as <br />defined above, or if accelerated testinz is performed, the date the pattern of <br />toxicity is demonstrated. A status report is to be provided to the Division at <br />• the 30, 60 and 90 day points of the PTI/TIE investigation. <br />Amendment 2 Issued d Ot s Effective P4 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.