My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV103790
DRMS
>
Back File Migration
>
Revision
>
REV103790
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:14:43 AM
Creation date
11/22/2007 1:10:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
7/11/1994
Doc Name
AMENDED PERMIT COLO WASTEWATER DISCHARGE PERMIT SYSTEMS PN CO-0000132 SOMERSET MINING CO SOMERSET MI
From
CDOH
To
SOMERSET MINING CO SOMERSET MINE & SANBORN MINE
Type & Sequence
MR27
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ~ I <br />Page lh of 19 <br />Permit No. CO-0000132 <br />• <br />B. MONITORING REQUIREMENTS <br />4. Acute WET Testing-Outfall 011 (continued) <br />The Division may extend the time frame for investigation where reasonable <br />justification exists. A request for an extension must be made in writing and <br />received prior to the 120 day deadline. Such request must include a <br />justification and supporting data for such an extension. <br />The permittee may use the time for investigation to conduct a PTI or move <br />directly into the TIE. A PTI consists of a brief search for possible sources of <br />WET, which might reveal causes of such toxicity and appropriate corrective <br />actions more simply and cost effectively than a formal TIE. If the PTI allows <br />resolution of the WET incident, the TIE need not necessarily be conducted. If, <br />however, WET is not identified or resolved during the PTI, the TIE must be <br />conducted within the allowed 120 day time frame. <br />Any permittee that is required to conduct a PTI/TIE investigation shall do so in <br />conformance with procedures identified in the following documents, ar as <br />subsequently updated: 1) Methods for Acuatic Toxicitv Identification <br />Evaluations. Phase I Toxicity Characterization Procedures, EPA/600/6-91/003 Feb. <br />91 and 2) Methods for Acuatic Toxicitv Identification Evaluations. Phase II <br />Toxicitv Identification Procedures, EPA/600/3-88/035 Feb. 1989. <br />• A third document in this series is Methods for Aquatic Toxicitv Identification <br />Evaluations, Phase III Toxicity Confirmation Procedures, EPA/600/3-88/036 Feb. , <br />1989. As indicated by the title, this procedure is intended to confirm that the <br />suspected toxicant is truly the toxicant. This investigation is optional. <br />Within 90 days of the determination of the toxicant or no later than 210 days <br />after demonstration of toxicity, whichever is sooner, a control program is to be <br />developed and received by the Division. The program shall set down a method and <br />procedure for elimination of the toxicity to acceptable levels. <br />(e) Request For Relief <br />The permittee may request relief from further investigation and testing where <br />the toxicant has not been determined and the Division has determined suitable <br />treatment does not appear possible. In requesting such relief, the permittee <br />shall submit material sufficient to establish the following: <br />(i) It has complied with terms and conditions of the permit compliance <br />schedule for the PTI/TIE investigation and other appropriate conditions as <br />may have been required by the Division; <br />(ii) During the period of the toxicity incident it has been in compliance with <br />all other permit conditions, including, in the case of a POTW, <br />pretreatment requirements; <br />• <br />Amendment 2 Issued e7 of ! Effective e9 0/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.