My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV103736
DRMS
>
Back File Migration
>
Revision
>
REV103736
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:14:38 AM
Creation date
11/22/2007 1:09:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Revision
Doc Date
3/21/1995
Doc Name
RATON CREEK MINES C-82-055 TR 17 POST MINING STRUCTURES
From
DMG
To
ENERGY FUELS MINING CO
Type & Sequence
TR17
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />C-82-055: TR-17 Mr. Al Weaver 4 <br />February 20, 1995, included with the map "draft" copies recognizes this as well. Both <br />maps need to be certified prior to inclusion into the permit as per Rule 2.10(2). <br />12) Page 348 references the existing Power Transmission Lines. Energy Fuels needs to <br />submit verification from the owner ,San Isabel Power Company, that these lines and <br />poles are the property and responsibility of San Isabel, and verification of whether <br />they will remain or be removed. <br />To summarize, items the Division requires to resolve these itemized concerns include; an <br />explanation of the variance in the reported length of the permanent diversion culvert, <br />demonstration to qualify the sediment pond to remain beyond phase III bond release, a <br />commitment from Energy Fuels that the small water tank will be relocated to one of the <br />permanent structures, the light use roads must be reclassified and upgraded to access roads <br />to remain as permanent, reclamation estimate costs need to be submitted for all remaining <br />reclamation tasks, certified copies of maps 12 and 17-1, and a letter from San Isabel Power <br />Company verifying ownership and responsibility of remaining power lines and poles. <br />The Division's projected decision date is scheduled for April 19, 1995. Submittal of this <br />information by April 10 should allow the Division adequate time to review and make a <br />decision by the proposed date. Please contact me if you have additional questions. <br />Sincerely, <br />~,-, <br />J~inet H. <br />Specialist <br />c: \jhb\C82055\trl7par.asw <br />
The URL can be used to link to this page
Your browser does not support the video tag.