Laserfiche WebLink
Table 1.4-17 Revegetation treatment sequencing aId associated production costs per acre excluding regralicg acd topsoil <br />replacarent. <br /> Operatitag Production Total <br />laid Use Treatment Equipment Rate Cost, Operator Production Cost <br />A,B,C(1) (A/hr)(2) Equiprent and ($/acre)(4) <br /> At tachrents <br /> ($/hr)(3) <br /> <br />A,B,C Scarification 4WD farm tractor/disc 3.4 86.86 25.55 <br />A Pick Rack 4CuYd std.Wh.loader 1.4 32.99 23.56 <br />A,B,C Drag topsoil 4WD farm tractor/disc 3.5 86.86 24.82 <br />A,B,C Fertilize W/0-46-0(1001k/A) 2WD faun tractor/spreader L0.1 42.99 4.26 <br />A Disc Seedba~] 4WD farm tractor/disc 3.6 86.86 24.13 <br />A Roller Harrow seedbed 2WD fame tractor/harrow 1.5 42.99 28.66 <br />A Drill seed perennial hay crop 2WD farm tractor/drill 3.0 42.99 14.33 <br />B Drill seal grazing lads 2WD fawn tractor/drill 2.7 42.99 15.92 <br />C Drill seed rangelands 2WD farm tractor/drill 2.7 42.99 15.92 <br />C Shrub transplanting 4 CuYd std. ~. inader 1.5 90.22 60.15 <br /> Shrubs/hr (per shrub pad) <br />B,C Install erosion control 180 Hp. Motor grader 581(ft/hr) 86.97 44.91(per 100 <br /> ditches (5) ft. of ditch) <br />(1) A=cropland; B=grazing land; C-rangeland. <br />(2) Basal on actual 1985 reclanation production rates. <br />(3) These costs fran Table 1.4-181. include equipment, operator and attaFments. <br />(4) Each mature shxvb clasp is canposed of 250 shrub pods. <br />(5) Assures 3 passes are reeled to construct each erosion control ditch on reclaimed areas. <br />• <br /> <br />aec 2/87 <br />