My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV103526
DRMS
>
Back File Migration
>
Revision
>
REV103526
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:14:23 AM
Creation date
11/22/2007 1:08:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
2/27/1987
Doc Name
PR-1 COLT PIT ACTIVITIES IN 1987
From
TRAPPER MINING INC
To
MLRD
Type & Sequence
PR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1.4-16 Production, material a~ total revegetation costs by reaegetation treatment with a total <br />revegetation cost for each of the three lam use types (A cropland, B grazing lan3, C rangeland-wildlife <br />habitat). <br />Iarrl Use Treatment Total Production Total Material Total Revegetation <br />A,B,C(1) Cost($/A)(2) Cost($/A)(3) Cost($/A) <br /> <br />B,C Scarification 25.55 - 25.55 <br />A Pick Fock 23.56 - 23.56 <br />A,B,C Drag topsoil 24.82 - 24.82 • <br />A,B,C Fertilize W/0-46-0(1007F/A) 14.26 11.00 15.26 <br />A Disc Seedbed 24.13 - 24.13 <br />A Fuller Hazrow seedbed 28.66 - 28.66 <br />A Drill seed perennial hay crop 14.33 30.00 44.33 <br />B Drill seed grazing lames 15.92 75.00 90.92 <br />C Drill seed rangelands 15.92 190.00 205.92 <br />C Shrub transplanting 60.15(per shrub - 15,038 (for each <br />pad) clump) <br />B,C Install erosion control ditches(4) 44.91(per 100 fC) - (for ditches on new <br /> reclaimed areas) <br /> <br /> • <br />(1) Total Iard use costs for above reclamation steps: <br />A (cropland)= 23.56+24.82+15.26+24.13+28.66+44.33=$160.76 per acre <br />B (grazing lard=25.55+24.82+15.26+90.92 =$156.55 per acre <br />C (rarlgelartis)= 25.55+24.82+15.26+205.92 =$271.55 per acre <br />(2) Total production costs fran reclamation costs (Table L4-17) <br />(3) Total material costs fran Reclamation cost (Table 1.4-19) <br />(4) Assume on A, B and C, aruwal reclaimacl areas, each ditch is no longer than 600 feet. Also, on new C area 46 <br />ditches are constructed annually and on new B areas 6 ditches are constructed annuall y. Total annual cost. <br />(5) Assure [hat 2 I/2 mature sluub clunpswill be constructed annually (250 shrub pads/clump). <br />aec 2/87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.