Laserfiche WebLink
3.0 Bood <br />Proposed activities in Colt pit will increase Trapper's bond liability, Addi- <br />tional costs resulting from this revision are enu;nerated below, <br />Activity Cost <br />1) Regrade of new portion of haul/walk road <br />2) Rangeland topsoil replace~nen[ (95.9 acres) <br />for Cult Pit addition and walkroad <br />3) Revegetation costs for Colt Pit addition <br />Subtotal <br />4) Indirect costs: <br />Public Liability insurance (0.8%) <br />Contractor performance bond (0.77) <br />MLRD administration expense (5%) <br />Contractor profit (107) <br />Subtotal <br />TOTAL <br />$ 420.00 <br />88,359.00 <br />34,062.00 <br />$122,841.00 <br />982.00 <br />860.00 <br />6,142.00 <br />12,284.00 <br />S 20,268.00 <br />SL43,L09.00 <br />Table 1.4-1, Summary of costs for Trapper Nine bond calculation, has been <br />revised and is included in this revision. This table replaces Che current s~xn- <br />mary in our existing permit. <br />In addition, the following supporting information is attached. <br />- A[tach~nen[ 3.1 - Regrade calculations fur new portion of haul/walk road. <br />- Attachment 3.2 - Topsoil replacement calculation fur Col[ Pit addition <br />and walk road. <br />- Attachment 3.3 - Revegetation calculations fur Colt Pit addition and <br />walkroad. <br />- Attachment 3.4 - Regrade Rate <br />- Attachment 3.5 - Topsoil Rate <br />- Attachment 3.6 - Rental rates from Wagner Equipment <br />Tables 1-4-16, 1.4-17, 1.4-18 and 1.4-19 address revegetaCiun costs and have <br />been revised. They, too, ace included and should replace their counterparts <br />in the permit document. <br />LWN/jb/ac 1/87 <br />