Laserfiche WebLink
ENERGY PUELS MINING COMPANY <br />SUMMARY OF REVISION/ADDITIONS <br />PR-04 Adequary Responses <br />RAT.QN CREEK MINE <br />REVISION/ DESCRIPTION PLACEMEIST <br />ADDITION "- INSTRUCTIONS <br />PERMIT TEXT <br />Page 22 Updated Legal Information Replaces Page 22 <br />Page 427 Revise Text Replaces Page 427 <br />Pages 426Rc and 426Rd Adjusted South Mine Access Road Ditch. Replaces Pages 426Rc and 426Rd <br />Page 427Ra Revised Upper Post Mining Ditch 1 and Replaces Page 427Ra <br /> added Contour Ditches <br />Pages 482R and 427 Rc Revised to address change to primary Replaces Pages 482R and 427Rc <br /> spillway. <br />Pages 684 and 685 Added Post Mining Drainage and Permanent Replaces Pages 684 and G85 <br /> Impoundment section. <br />ADDENDUM D <br />Raton Creek Access Road Ditch Sedcad computer printouts Eoz Macon Creek Insert in the back of Addendum D <br />South Access Road Ditch South <br />Raton Creek Contour Ditches Sedcad computer printouts for Raton Creek Insert in the back of Addendum D <br /> Coatout Ditches <br />Raton Creek Upper Post Mine Sedcad computer printouts for Raton Creek Insett in the back of Addendum D <br />Ditch 1 Upper Post Mine Ditch t <br />