Laserfiche WebLink
7 � <br /> f ` • <br /> 3 . On Page G-i paragraph 6 you hated Ch " riprap so iwayS '.V II be <br /> installed at the de.iatering discharge ocations . The design for the <br /> riprap soillways will have to oa submitted to the Division before <br /> construction takes place . All soilwAvs will have to be designed by a <br /> professional engineer and imolemented+ lin accordance with best engineering <br /> practices . <br /> EXHIBIT L. Reclamation Cost <br /> The reclamation cost for the amendment submitted is too low. The following is <br /> the Divisions estimate. <br /> Overburden Placement and Grading <br /> Estimate 4625 linear feet of shoreline <br /> 23, 125 cubic yards of material to be moved at approximately 1 ,00 cubic yard= <br /> $23, 125. <br /> Top soil placement and grading 6,937 .5 cubic yards appox $1 .00 <br /> cubic yard. $6937. 0 <br /> Revegetation of shoreline 5 acres@• 500= $25 <br /> Which makes the total reclamation cost to be $30,31 50. <br /> If you have additicr.=' questions , please call . <br /> Sincerely, c �� <br /> Berhan Keffelew <br /> Reclamation Specialist <br /> BK/srm <br /> 4401F <br /> Y <br /> 1 <br />