My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV103375
DRMS
>
Back File Migration
>
Revision
>
REV103375
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:14:12 AM
Creation date
11/22/2007 1:05:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
6/11/2007
Doc Name
Review Cost Estimate Memo
From
Jim Stark
To
Kent Gorham
Type & Sequence
MT5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION ~ ~ sheet 2 of 2~,~ <br />Haulinst Capacity <br />I (weight) Basis <br />Material weight : 2,550 pounds/LCY <br />Material description <br />Earth -Dry packed <br />Rated payload : 48,000 pounds <br />Payload capacity : 18.82 LCY <br />Cvcle Time <br />Scraper loading time ` : 0.90 <br />Maneuver and spread time : 0.60 <br />'load time per scraper pair an push-pull models <br />Bowl (volume) Basis <br />Struck volume : 14.00 LCY <br />Heaped volume : 20.00 LCY <br />Average volume : 17.00 LCY <br />Adjusted capacity : 17.00 LCY "' <br />hourly production reflects volume per scraper pair on push-pull models <br /> Job Condition Corrections : Site altitude (ft.) : 6,100 <br /> Scraper Push dozer Source <br />minutes Altitude adj.: 1.000 NA (Cat HB) <br />minutes Job efficiency : 0.830 NA (Cat HB) <br /> Net correction : 0.830 NA <br />Travel time <br />Road condition description :Firm, smooth, rolling, dirt/It. surfaced, watered, maintained <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)" <br />1 1,600 -7.00 3.00 -4.00 2938 0.60 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time <br />Retum route <br />"travel time for each segment is adjusted for acceleration/deceleration. <br />table velocities are max. attainable per total resistance shown, not ave2ge <br />Return time <br />Total scraper team cycle time (load + haul + maneuver and spread + return) <br />Unadjusted unit produdion/hour : 661.93 LCY/hour "` Adjusted for job conditions <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers <br />Adjusted single scraper team (unit) hourly production <br />Adjusted multiple scraper team (fleet) hourly production <br />0.60 minutes <br />0.98 minutes <br />3.08 minutes <br />549.40 LCY/hour <br />2 scraper(s) <br />549.40 LCYRtour <br />549.40 LCYmour <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) <br />Unit cost : 50.975 /LCY <br />Total job time : 9.21 Hours <br />Total job cost : $4,937 <br />
The URL can be used to link to this page
Your browser does not support the video tag.