Laserfiche WebLink
sheet t of 2 <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division O/Minerals And Geology <br />045 State :Colorado Permitfob # : C-81-014 <br />06/11/2007 County :Fremont Abbreviation :none <br />JRS Site :Southfield Mine Filename :C014-045 <br />Permit or other job action :2007 Midterm Review <br />Task description :Replace Topsoil from Stockpile M-3 to Ponds 3 and 4 <br />HOURLY EQUIPMENT COST <br />Description <br />Cost ert <br />Shift basis : 1 per day <br />Scraper work team -Scraper :Cat 627G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area :NA <br />-Dump area :ANA <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck :Water Tanker, 2,500 Gal. <br />~akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 NA NA NA grader misctruk <br />Utilization-machine : 100 NA NA NA 50 50 <br />-Ripper attachment: NA NA NA NA NA NA <br />OwnerhipcosUhour: $60.47 NA NA NA $32.63 $7.50 <br />OperatingcosUhour: $119.18 NA NA NA $20.46 $7.33 <br />Ripper op. wsUhour : NA NA NA NA $0.00 NA <br />Operator cost/hour : $24.95 NA NA NA $24.47 $34.24 <br />Unit subtotals : $204.60 NA NA NA $77.56 $49.07 <br />Number of units : 2 0 0 0 1 1 <br />Group subtotals : Work : $409.20 Support : $0.00 Maintenance : $126.63 <br />Total work team cosUhour : $535.83 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 4,500 CCY factor: 1.125 volume : 5,082 LCY <br />Source of quantity take-off :Page 2.05.3-60 <br />Source of estimated swell factor :CAT Handbook <br />