Laserfiche WebLink
Where: <br />• S'z =release area variance <br />n, =release area sample size, and <br />Sze =reference azea variance <br />n2 =reference area sample size <br />The results of sampling efforts will be contained in the annual reclamation report. The presentation will <br />include the raw field data, a summary of the analyses, and results of the analysis. <br />On August 15, 1985 (revised December 8, 1986) Basin submitted a rill and gully plan to the Division. <br />Exhib26, Rill and Gully Plan, presents a copy of this plan. <br />Sealing and Manaein¢ Mine Openings <br />Sealing of the openings which access the underground coal mining operations at the Golden Eagle Mine <br />will be completed upon the final closure of mining operations to minimize safety hazards to man and <br />wildlife in these areas. Atypical mine opening seal is shown on Figure 4. Figure 5, Typical Borehole <br />Seal, shows a typical borehole seal that will be utilized by Basin, except as described in Section 2.05.4 <br />~~ <br />f). Reclassification and Transfer of Ventilation Facilities to Industrial Use <br />Methane degasification wells, airshafrs, and open boreholes penetrating the underground mine workings <br />will be reclassified for industrial use. Stroud Oil Company, aka Apache Canyon Gas, L.L.C. will obtain <br />• the necessary permits through the State of Colorado, Oil and Gas Conservation Commission to develop <br />methane gas production wells at these locations. XTO Energy, the current owner of Apache Canyon <br />Gas, plans to develop addition gas wells and a compressor station south of Apache Canyon. This <br />activity will require improving the road through Apache Canyon. This road will pass through and <br />impact the reclamation activities at the Apache Canyon Airshafrs. These areas will also be reclassified <br />as Industrial Use areas. <br />Reclamation of these reclassified facilities will be in accordance with the Oil and Gas Conservation <br />Commission. When the appropriate bonds have been filed, and adequate proof of bonding submitted to <br />the Division of Minerals and Geology, Basin will request bond release for these facilities, and will only <br />be responsible for these facilities to the extent required by Rule 4.15.10(2). <br />These facilities are listed in Exhibit 19-1 Bonding Reduction Schedule for TR 45, Exhibit 19-7 <br />Bonding Requirement for Apache Canyon Airshafts, TR-45 Exhibit 31 Industrial Land Use <br />Classification for Methane Gas Production Schedule, and Maps TR45-1 through TR45-5. <br />2.05.5 Post Mining Land Uses <br />The post mining land use which Basin proposes for the permit area at the Golden Eagle Mine shall <br />consist of pastureland, rangeland, ranchette and industrial use (natural gas production). This is identical <br />to the pre-mining land use as shown on Map 4, with the addition of industrial use. This is consistent <br />with approved land uses as determined by the Las Animas County Zoning Board. Detailed <br />explanations of each of these land uses which Basin plans to implement on reclaimed lands is located in <br />Section 2.04.3 of this application. <br />• <br />TR-56 2.05-27 (Revised 8/5/04) <br />