My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV103250
DRMS
>
Back File Migration
>
Revision
>
REV103250
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:14:03 AM
Creation date
11/22/2007 1:04:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982036
IBM Index Class Name
Revision
Doc Name
EXHIBIT L RECLAMATION COSTS
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> <br />TASK 3 <br />RIP ROADS TO 3' DEPTH <br />Ripping Requirement <br /> <br />Approximately 11,500' of access and haul road, averaging 30' wide, with ripping to 3' <br />depth. 38,300 cy <br />Equipment and Productivity <br />Use a CAT D9R DS Tracked Dozer w/3-Shank Ripper <br />Productivity -Approximately 1,500 cy (in-place) per hour assuming a seismic velocity of <br />approximately 4,000 ft./sec. Using an operating factor of 0.83 (50 minutes operation per <br />scheduled hour) results in an adjusted productivity of 1,245 cy (loose)/hr. <br />Equipment Hours and Cost <br />Ripping would require 31 dozer hours to complete (4 days at 8 hours per day). <br />31 hrs. x ($150.96/hr. (D9R Dozer)) _ $4,680 <br />• <br />~J <br />L-5 <br />Revised May 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.