Laserfiche WebLink
• <br /> <br /> Minor Revisions Summarv <br /> (continued) <br />MR28 Area 60 topsoil handling Approved 07/14/88 <br />MR29 Area 51 East topsoil salvage Approved 08/16/88 <br />MR30 Underground storage tank disposal Approved 09/16/88 <br />MR31 Hydrology monitoring list change Approved 11/28/88 <br />MR32 Area 61 access road Approved 12/07/88 <br />MR33 Geotechnical test pit Approved 03/03/89 <br />MR34 Liability boundary change Approved 03/17/89 <br />MR35 Lube facility site investigation Approved 04/10/89 <br />MR36 Area 51 East buffer zone Approved 04/24/89 <br />MR37 Relocate haul road C ditch Approved 04/26/89 <br />MR38 Fresh water system Approved 05/19/89 <br />MR39 Bedrock well transfers Approved 05/17/89 <br />MR40 Guard shack culvert installation., Approved 06/22/89 <br /> silt fence removal <br />MR41 Temp access road to topsoil pile Approved 08/08/89 <br />MR42 Grazing plan Approved 08/25/89 <br />MR43 Modify area 51W topography Approved 09/14/89 <br />MR44 Hydrologic monitoring plan Approved 10/02/89 <br />MR45 Sediment control at topsoil pile Approved 09/28/89 <br /> (Pond K area) <br />MR46 Clarification of facilities Approved 10/31/89 <br />MR47 Windrow for topsoil pile 33-31 Approved 10/31/89 <br />MR48 Expand coal pond, 48 inch culvert Approved 04/27/90 <br />MR49 Sampling tower Approved 04/27/90 <br />MR50 Small area exemptions Approved 05/23/90 <br />