Laserfiche WebLink
<br />inor Revisions Summar <br />(continued) <br /> <br />MR51 Substation installation Approved 05/30/90 <br />MR52 Lube station monitor wells Approved 07/05/90 <br />MR53 Topsoil for drainage work, Area 61 Approved 07/12/90 <br />MR54 Topsoil pile access route Approved 07/17/90 <br />MR55 Percolation test for leach field Approved 08/21/90 <br />MR56 Stoker pad drainage control Approved 08/28/90 <br />MR57 Pond T SAE and ditch F-4 Approved 09/14/90 <br />MR58 Hydrologic monitoring plan Approved 10/10/90 <br />MR59 Haul road B expansion Approved 09/13/90 <br />MR60 Haul road c upgrade Approved 09/24/90 <br />MR61 Veg monitoring changes Denied 11(02/90 <br />MR62 Rangeland seed mix Approved 11/30/90 <br />MR63 3-year monitoring Approved 11/23/90 <br />MR64 Pond B drainage control Approved 01/28/91 <br />MR65 ARR submittal date Approved 02/25/91 <br />MR66 SAE's (2) Approved 03/20/91 <br />MR67 Install ramp Approved 04/25/91 <br />MR68 Modify pasture prod. sample Approved 06/25/91 <br />MR69 Alfalfa sampling Approved 06/19/91 <br />MR70 Add stockpond 6-b Approved 07/02/91 <br />MR71 Add monitoring wells Approved 07/30/91 <br />MR72 Modify permanent culverts 'Approved 08/27/91 <br />MR73 Land use boundary clarify Approved 10/02/91 <br />MR74 Midterm review responses Approved 12/18/91 <br />MR75 Waste rock site drilling Approved 04/30/92 <br />MR76 Ranch waterline Approved 11/4/92 <br />