Laserfiche WebLink
Mr. Jamey R Stork <br />Calomdo Divi.rian ofMineroG eh' Geology <br />A.v~urt 7, 2002 <br />Pagc 2 <br />Response: Sections 2.03.4 and 2.03.5 have been revised as necessary. Copies of the revised sections <br />accompany this TR submittal. <br />RULE 2.03.6 <br />Comment 2 -This comment was previously addressed in the MR-44 submittal. <br />RULE 2.10.3 <br />Comment 3 -This comment was previously addressed in the TR-33 submittal. <br />Comment 4 -This comment was previously addressed in the TR-33 submittal. <br />Comment 5 -This comment was previously addressed in the TR-33 submittal. <br />Comment 6 -This comment was previously addressed in the TR-33 submittal. <br />Comment 7 -With the approval of Technical Revirion 32 and the completion of the permanent Mamie Creek diverrion, <br />pleare provide the Division with an updated Map 2S, Magpie Creek Ar-Built. <br />Response: A survey of the Magpie Creek diversion has been completed and an as-built profile of the <br />diversion showing locations of drop structures, nprap, and average channel slope is shown on new Map 25b, <br />Magpie Creek Postmine As-Built Profile. Three (3) certified copies of this map are included with this TR <br />submittal. <br />RULE 4.05.2(3) <br />Comment 8 -This comment was previously addressed in the MR-42 submittal. <br />Comment 9 -This comment was previously addressed in the MR-42 submittal. <br />Comment 10 -This comment was previously addressed in the TR-33 submittal. <br />Comment 11-This comment was previously addressed in the bIR-42 submittal. <br />RULE 4.05.9 <br />Comment 12 -Phis comment was previously addressed in the 112-33 submittal. <br />RULE 4.05.13 <br />Comment 13 -This comment was previously addressed in the TR-33 submittal. <br />RULE 4.06.5 <br />Comment 14 - On page 2.05.4-17 and page 4,06-6, EFCI cammitr to rampGng and completing laboratory analyrer nn the <br />upper fourfeet of replaced roil and underlym8 material prior to reeding. Agood dircurrion of their ramplingplan it on page <br />2.05.4-77. Rerultr of al! rampling must beprovided to the Divirionprior to final reedingper Rule 4.065. A commitment to <br />rubmit the nsultr to ut prior to reeding is not included in the narrative, and it rhould be added <br />