My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV102981
DRMS
>
Back File Migration
>
Revision
>
REV102981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:13:43 AM
Creation date
11/22/2007 1:02:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
8/9/2002
Doc Name
Letter, Application & Public Notice
From
Energy Fuels Coal Inc
To
DMG
Type & Sequence
TR34
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENERGY FUELS COAL, INC. <br />PO Box 459 <br />Florence, Colorado 81226 <br />August 8, 2002 <br />RECEIVED <br />Mr. James R Stazk <br />Colorado Division of Minerals & Geology AUG 0 9 2002 <br />1313 Sherman Street -Room 215 <br />Denver, Colorado 80203 llevisien of Mlrterels artd Geology <br />(303) 866-3567 <br />Re: Energy Fuels Coal, Inc. -Southfield Mine (Permit No. C-014-81), Minor Revision TR-34 Completion <br />of Mid-Term Review Comment Responses and Fan House SAE <br />Dear Mr. Stark: <br />With this transmittal, Energy Fuels Coal, Inc. (EFCI) is requesting that the DMG approve TR-34 for the <br />Southfield Mine site. Specifically, this TR is in response to the remaining 2002 Mid-Term Comments. In <br />addition, EFCI is requesting approval for one more SAE for a small borrow azea located adjacent to the <br />South Fan azea. <br />To assist the division EFCI has included in this cover letter aze responses to all remaining Mid-term <br />comments and references to the location of previously responded to comments. <br />The following information is included in this TR: <br />• TR application form, <br />• Public Notice <br />• Revised text pages, <br />• Revised List of Maps, <br />• Revised or new drawings (3 each/certified), <br />• South Fan Borrow azea SAE SEDCAD4 Demonstration, and <br />• Summary of Revisions and Insertion Instmctions <br />The following discussions respond to each comment in the EFCI blid-Term Permit review. In instances <br />where the comment has already been addressed in previous submittals (NIR or TR), the specific MR or TR is <br />referenced. <br />RULES 2.03.4 AND 2.03.5 <br />Commettt 1- With nipect to Ruler 2.03.4 and 2.03.5, pleare rtpdate all Legal, Finanaal, and Compliance Information <br />and D~vnerrhP and Cantrollnfamration, ar ne~errary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.