Laserfiche WebLink
<br />E\HIQIT L --RECLAMATION COSTS <br />The reclamation costs for the site include cost estimates separate for the hightvall areas, the final <br />~', pit floors, roadways, and ditches, and the SWMP area to the north of the mining area. Also, <br />', costs of materials, structures, and mining equipment removal will be listed below. <br />Area Activity & Acreage Cost per acre Total cost <br />sitewide Reclamation equipment $1000.00 <br />Mobilization <br />sitewide Demolition, burial of con- <br />concrete waste, removal of <br />scrap and mining equipment $3000.00 <br />highwalls Highwall bench final config. <br />'. and ditch construction <br />approximately 20 acres 1500/acre $:0,000.00 <br />Main pit areas Haul topsoil, grading,seeding, ,34aolQ,~. <br />~~ <br />Fertilizltion, mulching, main. i is~, yoo <br />2200/acre~ <br />Roadway removal App. 44 acres $96,800.00 <br />SWMP area Sediment pond construction, <br />~ Grading, seeding, fert, mulch <br />Main, app. 30 acres affected 1800/acre $36,000.00 <br />Removal of pavement from road easement, City of <br />Canon City property, scarifying roadway and reveg <br />of road easement area (4S acres) 510,000.00 <br />Total reclamation cost $1 ~ 6,800.00 <br />20% overhead & contractor margin $? 5,360.00 <br />Total closure estimate, 100 acres $212,160.00 <br /> <br /> <br />V ~~`'~ ~V O <br />/ <br />y <br />77 <br />-- ` <br />' <br />l i ~~ <br /> s , ~ q <br /> ~`tDl ~°O <br /> aq ,9~F ~^- cx~,ooo <br /> <br />