My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-08-26_REVISION - M1979205
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979205
>
2004-08-26_REVISION - M1979205
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:21 PM
Creation date
11/22/2007 12:57:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979205
IBM Index Class Name
Revision
Doc Date
8/26/2004
Doc Name
Revised Reclamation Plan
From
Greg Lewicki and Associates
To
DMG
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
limits. The slope will then be laid back to the 3H:1 V slope. The slopes will be backfiiled with <br />either overburden or material excavated from the shelf wetlands. Ramps into the pits will be <br />left as shallow 7H:1 V sloped areas. To minimize final reclamation tasks, slopes will be <br />backfilled promptly after mining is complete. <br />Creation of wetland shelves will be completed using dozers or excavators to remove material <br />from the shelf area. Material will be removed to the depth of the water table and topsoil will be <br />replaced to a thickness of 12 inches. The lateral extent of the shelf will extend from the lake <br />edge to a 5-foot buffer from the existing wetlands. This buffer will prevent disturbance to the <br />adjacent wetlands. Also during the excavation of the shelves existing cottonwoods and willow <br />bunches will be left intact. See Map F-3 for shelf and fringe details. <br />Re-Topsoiling Plan <br />Topsoil will be replaced in all disturbed areas to a minimum depth of 12". It is expected that <br />more than 12" of topsoii will be available due to the lake areas not needing topsoil. If this is <br />the case additional topsoil will be placed in the disturbed areas. The topsoiling will occur to <br />five feet below the expected water table. <br />Revegetation Plan <br />The site will be revegetated as follows: <br />Dry Rangeland The following seed mix is recommended for the upland dry <br />rangeland areas. After regrading, the reclaimed area should be <br />tilled. The seed mix can then be broadcast and mulch applied over <br />the seeding. The mulch will be crimped in at a rate of 1.5 <br />tons/acre. Only certified weed free mulch will be used. <br />Species Lbs/acre Seed, PLS <br />Palome Indian Ricegrass 6.0 <br />Ephraim Crested Wheatgrass 3.0 <br />Canbar Canby Bluegrass 1.0 <br />Sodar Streambank Wheatgrass 3.0 <br />Canada Wildyre 2.5 <br />Slender Wheatgrass 2.5 <br />Fourwing Saltbush 0.3 <br />Rabbitbrush 0.3 <br />Skunkbush Sumac 0.3 <br />Total 18.9 <br />8/25/04 Page ~2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.