Laserfiche WebLink
<br />Modify Application Item 13 to read: Excavation by one of the above methods, then loading to <br />processing equipment by one of the above methods. Onsite processing to include Crushing, <br />Screening, Asphalt and Asphalt related product production and Concrete botching and Concrete <br />related product production. All onsite processing is considered intermittent activity specific job <br />related with a continuous onsite duration of less than 6mo/event. <br />Exhibit B; Index Map Water Issues <br />Response; The Water Easements -Described in Exhibit N "Source of Legal Right to <br />Enter"; Lease Purchase Agreement (Pgl, Phgl; "A spring..."). No other use or operational <br />restrictions apply. A small dike exists in the draw from which water may be withdrawn. The dike <br />is within the water easement granted to the operator. <br />Exhibit C; Pre-mining and Mining P/an Maps, Map Corrections Noted <br />Response, Pgh #1; Ratio Scale 1" = 100 ft <br />Response, Pgh #2; Topographic Data - At this time it is the choice of the operator to <br />continue to use the presented Topographic contour Data and to restrict the use of the eery limited <br />spot elevation data; as the spot elevation data is not sufficient to modify the Ortho Photo <br />generated topo data, and significant overall site variances would result. <br />Response, Pgh N3; North Contour Boundary Error -Error noted and corrected. <br />Response, Pgh #4; Fence Line Ownership -The fence along the north line is owned by <br />the land owner all other fences are joint ownership and represent non-significant structures as they <br />exist in a dilapidated state. These fence lines are quite old and in several locations exist only as <br />loose wire lying on the surface. <br />hr the event drat future damage claims are made regarding these fence lines against the <br />operator, the operator agrees, that if responsible for the damage, to restore [he fence .'o a <br />cwrditiar similar [o or better thm:, existing at the time prior to damage. <br />Operator; Montrose County <br />Tim Roberts <br />County Engineer <br />The pernut boundary as identified in the corrected maps depicts the actual and true ownership of <br />the Lary A Corp. The fence lines that exist other than on property lines are convenience fencing. <br />No damage agreements are necessary as the operator takes responsibility for operator induced <br />damages. <br />Response, Pgh #S; Stockpiles and Processing Equipment Locations -Product <br />stockpiles and processing equipment will have the full use of the pit floor during mining <br />Typically this processing equipment will be located adjacent to the active mined face. 1\o specific <br />location is assignable to processing equipment or product stockpiles. Topsoil stockpile:; are <br />further annotated on maps. <br />Response, Pgh #6; Detail A and 3:1 slopes - Detail A is to depict the final recaaimed <br />slope after mining in each phase @ 3;1. <br />R@C01V2f~ <br />NOV '? 8 1997 <br />D»ratt9n Field ontce <br />Division of Minerals 8 Geology <br />