Laserfiche WebLink
• ~ ENVIRONMENT, INC. • • PAGE 3 <br />NOVEMBER 19, 7997 <br />PERMANENT MANMADE STRUCTURES <br />2. I discussed your suggestion with Mike on how Delta could begin to strip the east parcel <br />and build the site berm along the south side of the East Pazcel. We think this is a good <br />idea and I have attached a simple engineering analysis of the berm placement and <br />stripping to this letter. Cross section B-B' on the Map Plat show how the berm will look <br />and can be reviewed when reading the engineering evaluation. Excavation of gravel will <br />not be done within 200 feet of the railroad until we have a compensation agreement or an <br />engineering demonstration showing we will not impact the tracks. <br />Thanks for your help and if you have any questions please call me at (303) 423-7297 <br />Sincerely, <br />Environment, Inc <br />~n~8" -~ " <br />Stevan L. O'Brian <br />President <br />cc Delta Sand and Gravel Co. <br />file <br />enclosures <br />