My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV102264
DRMS
>
Back File Migration
>
Revision
>
REV102264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:53 AM
Creation date
11/22/2007 12:53:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996060
IBM Index Class Name
Revision
Doc Date
12/13/2000
Doc Name
FAX COVER
From
DMG
To
HALL IRWIN CORP
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SINE SD # OR PROSPECTII~ ID#: M-1996-060 • PAGE: 5 <br />INSPECTION DATE: 12-7-00 INSPECTOR'S INITIALS: ACS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />correc*_ed by the dates given to reduce their severity wher. considered by the Mined Land <br />Reclamation Board. The inspector noted on the first page of this report should be notified <br />of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />PROBLEM PB-1: The topsoil pile located at the south end <br />of the Firestien Pit was placed with oversteepened side <br />slopes and is covered with weedy vegetation. <br />CORRECTIVE ACTION: Slope the topsoil pile to maximum 2:1 <br />(3:1 preferred) and seeding to establish an interim grass <br />cover. Application of the approved reclamation seed mix and <br />weed free mulch is recommended. A corrective action date of <br />May 31 is specified, but the ideal seeding time would be as <br />soon as possible after the ground thaws. If a spring 2001 <br />seeding is ineffective, reseeding in the fall may be required. <br />Since the topsoil stockpile is located in the floodplain, it <br />should be configured as a berm aligned with the river. <br />CORRECTION <br />DATE <br />5/31/01 <br />PH or PV PB <br />TOPIC(S) TS <br />
The URL can be used to link to this page
Your browser does not support the video tag.