My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV102100
DRMS
>
Back File Migration
>
Revision
>
REV102100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:41 AM
Creation date
11/22/2007 12:52:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977193
IBM Index Class Name
Revision
Doc Date
1/26/1996
Doc Name
MEMO TEZAK QUARRY/SWMP TR4/PN M-77-193
From
DMG
To
JIM STEVENS BRUCE HUMPHRIES
Type & Sequence
TR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' MEMO to J. Stevens/B. Humphries <br />January 26, 1996 - Tezak Quarry <br />Page 2 <br />2. Average annual sediment loss from the disturbed area. <br />3. Engineering designs including longitudinal profiles, cross sections, and plan views of all <br />channels, ponds, culverts, spillways, or other hydraulic structures, as necessary. <br />4. Engineering design(s) and construction techniques of any alternative sediment and/or erosion <br />control structures other than those specified in item 3 above. <br />5. A list of all property owners that may be affected by the proposed stormwater management <br />plan and their necessary approvals. <br />6. A commitment to design and build all proposed stormwater controls such is channels, <br />ponds, and spillways in such a way as to minimize impacts to the hydrologic balance within <br />the quarry as well as the surrounding area. <br />7. A commitment to have all proposed structures installed and functioning prop~;rly no later <br />than October 31, 1996. <br />8. Contingency plans for a discharge of excessive stormwater flows offsite onto 'Iirnnel Drive <br />(i.e., a 100-year storm event or greater). <br />9. A commitment to have the construction of all proposed structures certified by a registered <br />professional engineer, <br />10. A schematic which shows the flow path of all nunoff water from the upper reaches of the <br />disturbed area, along the haul road, through the various containment ponds, ro the lower <br />reaches of the disturbed area. <br />11. A discussion of which structures will be left in place during final reclamation, which <br />stnrctures will be removed, estimated construction costs of any temporary stnuctures, and <br />any plans for stream channel reconstruction during final recLunation. <br />12. A commitment to cease and desist from any disturbance in the amendment ana, until the <br />operator has received Division approval of an acceptable plan for minimizing impacts to the <br />hydrologic balance in the quarry and surrounding area during management of stormwater <br />runoff and has submitted certifications from a registered professional engineer that all <br />designed structures have been constructed and are functioning properly. <br />M:\oe~\TVak.964 <br />
The URL can be used to link to this page
Your browser does not support the video tag.