Laserfiche WebLink
CIRCES Cast Estimating Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />Agency or oryanization name : OMG <br />Task#: 005 State:Cobretlo Pemutlob #: M-1986143 <br />Data: 11I19ld004 Counry:La Plate Abbreviation :none <br />User: RCO Site: Texas Creek Grave/Pit Filenarre:M/03-005 <br />Permit or other job action : Tr3 <br />Task descdptlon :Haul reclamation equipment to and /tom site <br />EQUIPMENT TRANSPORT RIG COST Shift basis: 1 per day <br /> Cost data source: CRG Data <br />Truck vactor description : Generic an-hghwey buck tractor. 6xd, tliesel poarered d00 HP <br />Track trailer tlesctlption :Generic folding gooseneck, drop deck equ rymenf bailer ( 25T, 50T end TOOT) <br />Available rig capacities: 0-25 Tons 2450 Tons 51+TOns <br />Cost Breaktlovm: Ownership cost/nour: $23.92 $25.18 S31.d5 <br />OpemtinO COSMWr: $30.29 $91.74 $35.14 <br />Operator cosbhour. 82Ld0 827d0 $2200 <br />Helper cas0hour: $0.00 $25.15 .&25.15 <br />Total Unit COSbhour: S8f.01 $110.01 $119.13 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description WeiphVUnit <br />(Tons) Ownership <br />CosVhr/unit Haul Rig <br />CosVhr/unit Fleet Size <br />(NO. units) Haul Trip <br />CasvhrRlaet Retum Trip <br />CosMrflleet DOT gamut <br />Cost/fleet <br />-Cat D8R Series II. 8SU 52.55 $48.82 $119.13 1 $16195 $119.13 $0.00 <br />-Reveg equipml 8.00 $1000 $81.01 1 $91.01 $8].01 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: 5258.% 5200.14 50.00 <br /> Nearest rtalor city or tovm vnthin project area region: BayTieltl Co <br />Tansoonation Cvcla Time: Non- Total are-vmY trevel distan:.e'. 8.0 stiles <br /> Roatlable Roatlabla AveraOe travel speetl: 40.0 mph <br /> Equipment Equipment <br />Haul titre (hours) = 0.20 0.20 Total non-roatlable nob/demob cast -: $442.60 <br />Retum titre (hours) = 020 0.20 'two routs vpe wiN haul rig <br />LoatlinB time (hours)= 025 NA Total roatlable rmWdemob cost^: $0.00 <br />Un108tlie9 titre (hours)= 0.25 NA one mots triD.whaul rig <br />Subtotals= 0.90 040 <br />JOB TIME AND COST Totaljob time: L80 hours <br /> Tptal jOb CO.St : $QQT <br />EpUIPMENT HAUL DISTANCE and TIME <br />