Laserfiche WebLink
E-18 <br />• <br />TABLB E-~ <br />BCHEDQLE AND BEOIIENCE OF TA81C8 TO BE ACCOMPLIBAED <br />1 2 3 4 5 6 7 8 9 10-36 <br />Abandon Wells _ <br />Facility Dismantling _ <br />Site Recontouring <br />Topsoil Placement & Seeding <br />(After final disturbance) <br />water Quality Monitoring _ <br />Revegetation Monitoring <br />• Estimated Timing for Recountourina/Tobsoiling/Revegetation <br />1992 Cavity ,~1 drill pads Na26-88-1 and Na26-90-5, <br />approximately 3.6 acres. <br />1993 Cavities #`2 and 3 drill pads, approximately 4 acres. <br />1994 Cavities 4, 5, and 6 drill pads, approximately 6 acres. <br />1995 Cavities 7, 8, and 9, approximately 6 acres. <br />1995 Submit CMLR amendment to continue operations through <br />year 2021. <br />1996 Cavities 10, 11, 12 and 13 drill pads, approximately 6 <br />acres. <br />2021 Recontour plant site and associated areas, i.e. water <br />well, monitoring wells, replace topsoil, revegetate <br />approximately 36.2 acres. <br />• <br />