My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV101956
DRMS
>
Back File Migration
>
Revision
>
REV101956
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:30 AM
Creation date
11/22/2007 12:50:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Revision
Doc Name
EVALUATION OF CYLINDRICAL AND LONG HORIZONTAL CAVITY SIZE NATEC LEASES PICEANCE CREEK BASIN COLO
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-4 <br />• cleared and disturbed. Activity associated with construction of <br />water supply and monitoring wells caused disturbance of 6.3 <br />acres. A production pipeline from well Na26-90-5 and Na26-88-1, <br />and water supply pipeline from Na26-90-1 to the plant facilities <br />disturbed 1.1 acres. Total disturbed acreage associated with <br />plant construction, wells and pipelines is 40.9 acres. Figure <br />D-5 illustrates mine site disturbed acreage. <br />Areas associated with 1990 activities such as natural gas <br />pipeline ROW (12 a.cres), and County access road ROW (30 acres) <br />were also disturbed. A telephone ROW was approved in 1990, and <br />the telephone line was installed within County Road 83 ROW and <br />access road ROW causing no additional disturbed acreage. Table <br />• E-1 lists disturbed acreage for the NaTec project. <br />In addition to those areas that have been disturbed by <br />construction activities, approximately 6.0 acres/year will be <br />disturbed in association with the well field operations. A total <br />of 257 acres may be disturbed over the 30 year project. The well <br />field surface disturbances will be required in order to provide <br />areas for drilling rigs to operate, areas for production <br />pipelines, and roads for well access. Also, areas will be <br />disturbed in order to provide pollution control measures for <br />drilling operations, e.g, retention ponds. After a mining cavity <br />is depleted, the wells are abandoned and the production pipeline <br />is relocated. Disturbed areas will then be reclaimed. <br />• Reclamation activities will consist of grading the disturbed <br />
The URL can be used to link to this page
Your browser does not support the video tag.