Laserfiche WebLink
E-3 <br />• strand barbed wire fence conforming to BLM Type D fence <br /> specifications, until bond release. <br />The authorized BLM officer shall be contacted at least 24 hours <br />prior to: <br />1. Surface disturbance by construction or maintenance activity. <br />2. Commencement of reclamation activity. <br />E.4 Site-Specific Reclamation Procedures <br />Site-specific reclamation procedures are identified in this <br />section for the two types of reclamation activities that will <br />occur on the project area. These two types include 1) the <br />• reclamation activities that will follow construction and those ~ <br />routine disturbances associated with the well field operations, <br />and 2) those reclamation activities that will be associated with ~ <br />the cessation of mining operations. Many of the specific, <br />routine reclamation procedures associated with each of these two <br />types of activities are identical and will be discussed in <br />tandem. Some the activities that will be associated with final <br />decommissioning of •the mining operations are different from those <br />routine reclamation activities and will be discussed separately <br />in E.4.3. <br />E.4.1 Construction and Well Field Reclamation <br /> In May, 1990 NaTec started site clearance and "dirt work" for <br /> <br /> process area of mine facilities. Approximately 33.5 acres were <br />