My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV101956
DRMS
>
Back File Migration
>
Revision
>
REV101956
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:30 AM
Creation date
11/22/2007 12:50:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Revision
Doc Name
EVALUATION OF CYLINDRICAL AND LONG HORIZONTAL CAVITY SIZE NATEC LEASES PICEANCE CREEK BASIN COLO
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-3 <br />• strand barbed wire fence conforming to BLM Type D fence <br /> specifications, until bond release. <br />The authorized BLM officer shall be contacted at least 24 hours <br />prior to: <br />1. Surface disturbance by construction or maintenance activity. <br />2. Commencement of reclamation activity. <br />E.4 Site-Specific Reclamation Procedures <br />Site-specific reclamation procedures are identified in this <br />section for the two types of reclamation activities that will <br />occur on the project area. These two types include 1) the <br />• reclamation activities that will follow construction and those ~ <br />routine disturbances associated with the well field operations, <br />and 2) those reclamation activities that will be associated with ~ <br />the cessation of mining operations. Many of the specific, <br />routine reclamation procedures associated with each of these two <br />types of activities are identical and will be discussed in <br />tandem. Some the activities that will be associated with final <br />decommissioning of •the mining operations are different from those <br />routine reclamation activities and will be discussed separately <br />in E.4.3. <br />E.4.1 Construction and Well Field Reclamation <br /> In May, 1990 NaTec started site clearance and "dirt work" for <br /> <br /> process area of mine facilities. Approximately 33.5 acres were <br />
The URL can be used to link to this page
Your browser does not support the video tag.