Laserfiche WebLink
,. , <br />6) Southside RSRDA riprap channel was incorporated into fuial reclamation design for RSRDA during <br />permit renewal review, but cost estimate was apparently not adjusted to account for channel <br />construction/riprapptacement. <br />7) Sewage lagoon cells reclamation is not specifically addressed in cos[ estimate. May have been <br />included in backfilling/grading of entire UTL area; need to verify. <br />8) Two wells recently constructed (or monitoring of the Rollins Sandstone need to be included in cost <br />eslimate for monitoring well sealing. One well is near the UTL and one is within the North Decline area. <br />9) Northwest Intake portal (costs for backfilling and seals, with permanent water discharge point). <br />l0) CRDA-1 and 2 permanent reclamation wildlife habitat rock placement (recently incorporated into <br />reclamation plan) <br />Dansword\8-99spfocus <br />