Laserfiche WebLink
RECLAMATION COST SUMMARY con['d sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (S) <br />n/e <br />Subtotal (K ): <br />____________ <br />L. DRILL HOLE/MONITORING YELL SEALING <br />Task No.~ Task Description ~ Cost (E) <br />n/a <br />Subtotal (L>: <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (E) <br />p, 5 ~ Demolition - removal of asphalt spill pad area ~ f500 <br />4 ~ Seeding of disturbed area, 20 ac ~ f8, 309 <br /> Fencing <br />b ~ Mob/Demob from Montrose ~ EI, 797 <br /> Subtotal (M ): f10, 600 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals 0. through M): 534,319 <br /> <br />11. INDIRECT COSTS <br />____________________________________________________________ ____________ <br /> <br />____________ <br />____________________________________________________________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT ____________ <br />Item No.~ <br />.. Item Description ~ <br />__ <br />_ <br />. Cost (f) <br />__ <br />.____I_ <br />7. ~ ______ <br />_______ <br />.____________._______...,_________.. I <br />Public Liability Insurance.... 1.550% of dir. ~ ____________ <br />5532 <br />2. ~ Contractor's Performance Bond 0.975% of dir. ~ 5335 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ 53,432 <br />4. ~ Job Superintendent.. <br /> Subtotal (A): E4, 298 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 538,617 <br />B. OMG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description ~ Cost (E) <br />1. ~ Minerals Program Admin. Fee at S.OOX of cntr.~ E7, 931 <br />NET ]NDIRECT COST PERCENTAGE: 78.15% Subtotal (B): 51,437 <br />____ , ____________ <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): fb, 229 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 540,548 <br />