Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd Sheet 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (E) <br />n/a <br />Subtotal (H): <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (S) <br />D ~ Re-cuttinp ditches end drainage, dozer task ~ 5500 <br />Subtotal (1): E500 <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.l Task Description ~ Cost (S) <br />________I__________________________________________________I____________ <br />3 ~ Respreeding topsoil over disturbed area, 20 ac ~ 517,816 <br />Subtotal (J): '817,876 <br />