Laserfiche WebLink
<br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />DOZER COST A PERFORMANCE DATA WORKSHEET <br />Machine Make 8 Model: Cat D8N <br />Dozer Blade: SEMI-UNIVERSAL <br />Attachment #1: ROPS Cab <br />Attachment #2: <br />Last Lost Revision: April, 1995 <br />BASE EQUIPMENT COSTS (CRG) <br /> <br />sheet 1 of 2 sheets <br />REFERENCES: 1) Cost Reference Guide (CRG) <br />2) Contractors Equipment Cost Guide (CECG) <br />3) Colorado Contractors Association <br />Wage Rate Schedule <br />4) Caterpillar Performance Handbook <br />~----------- Base Ownership 8 Overhaul Costs ------------~-----~--------- Base Operating Costs --------------- <br />~ Ownership ~ Overhaul ~ Field Repair ~ <br />~ Depreciation CFC Overhead ~ Labor Parts Labor Parts ~ Fuel Lube Tires G.E.C. <br />Machine 516.90 58.78 56.52 54.63 511.53 55.14 59.27 59.91 53.23 50.00 51.55 <br />Attachment #1 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 <br />Attachment #2 53.40 51.06 50.79 50.77 51.33 51.41 51.11 50.00 50.29 50.00 50.93 <br />COST ADJUSTMENT FACTORS (CECG) <br />Factor Description Base Value Adj. Value Multiplier <br />Acquisition cost: 5355,510.00 5286.425.52 0.806 <br />Econ. life hrs.-machine: 13.245 10.455 1.267 <br />-attach, #1: 11.000 11.000 1.000 <br />•attach, #2: 8.200 8.200 1.000 <br />Annual use hours: 2.112 1.525 1.385 <br />Mechanic's labor cost: 527.15 523.32 0.859 <br />Fuel cost/gal.-gasoline: 51.15 51.15 1.000 <br />-diesel: 50.94 50.94 1.000 <br />Lube cost: 53.23 53.23 1.000 <br />Tire life hours: 0 0 1.000 <br />Tire factor: 0 0 1.000 <br />Tire cost: 50.00 50.00 1.000 <br />ADJUSTED EQUIPMENT COSTS <br />ACQUISITION COST BREAKDOWN <br />Cost Elements (CECG) Factor Adj. Lost <br />8a se purchase price 5355 .510. 00 <br />Less dealer discount 0.100 535 ,551. 00 <br />Plus freight 0.020 57. 110. 20 <br />Plus dealer charges* 0.005 51. 777. 55 <br />*MLRD estimate ----- ---- --- <br />Adjusted purchase price 5328. 846. 75 <br />Plus taxes: Sales @ 3X 59. 865. 40 <br /> SMM @2X 56. 576. 94 <br />Less tire cost 50. 00 <br />Less salvage value 0.179 558. 863. 51 <br />Net acquisition cost 5286.425.52 <br />~---------- Adjusted Ownership 8 Overhaul Costs ---------~------------- Adjusted Operating Costs <br />Acquisition cost 516.36 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A <br />Econ.life -Dozer 6 ROPS 520.72 N/A N/A 55.87 514.61 56.51 (11.74 N/A N/A N/A N/A <br />-Attach. #2 N/A N/A N/A 50.98 51.68 51.79 51.41 N/A N/A N/A N/A <br />Annual usage 522.65 513.63 510.12 N/A N/A N/A N/A N/A N/A N/A N/A <br />Oouble shifts 516.99 56.81 55.06 N/A N/A N/A N/A N/A N/A N/A N/A <br />Triple shifts 515.11 54.54 53.37 N/A N/A N/A N/A N/A N/A N/A N/A <br />Mech.labor-Dozer i ROPS N/A N/A N/A 55.04 N/A 55.59 N/A N/A N/A N/A N/A <br />•Attach. #2 N/A N/A N/A 50.84 N/A 51.53 N/A N/A N/A N/A N/A <br />Fuel/lobe •Dozer 8 ROPS N/A N/A N/A N/A N/A N/A N/A 59.91 53.23 50.00 51.55 <br />-Attach. #2 N/A N/A N/A N/A N/A N/A N/A 50.00 50.29 50.00 50.93 <br />