Laserfiche WebLink
<br />(d) Storage Building (30' x 60' x 20'): During the July 12, 1999 site inspection <br />conducted by Mr. Steve Shuey, it was determined that the storage building of interest <br />had been earlier removed and no concrete slab or foundation materials remain. As <br />such, the bond provision for this structure is extraneous. Refer to photograph 9 in <br />Appendix A. <br />Division Calculated Bond Amount: $2,042.00 <br />Bond Release Request Amount (100%): 52,042.00 <br />3.0 <br />PARTIAL BOND REL-EASE REQUEST <br />Based on the foregoirn~ documentation (photographic record provided as Appendix A), Camp <br />Bird Colorado, Inc. requests a partial release of bond monies in the amount of $47,957.00 <br />(Forty Seven Thousand Nine Hundred Fifty Seven Dollars). The itemized amounts are as <br />follows: <br />Item A-1: $ 1,205.00 <br />Item A-2: $ 9,517.00 <br />Item I-7: $ 848.00 <br />Item I-8: $ 3,675.00 <br />Item J-9a: $ 7,995.00 <br />Item J-9b: $ 2,346.00 <br />Item K-11: $10,000.00 <br />Item M-12: $12.371.00 <br />TOTAL: $47.957.00 <br />CERTIFICATION <br />The undersigned hereby certifies that the above-described reclamation activities have been <br />completed to the extent defined herein and that said reclamaiion activities have been <br />completed in accordance with the approved Reclamation Plan and/or Technical Revision No. <br />1 to Permit M82-090. In addition, it is further certified that said reclamation has been carried <br />out in accordance with applicable portions of the Hard Rock and Metal Mining Rules and <br />Regulations (May 1977, as amended) under the Colorado Mined Land Reclamation Act. <br />t {> ~u I t~C~t~ciV r <br />Signed Title <br />Scott A. Butters President <br />Name Title <br />Camp Bird Colorado, Inc. <br />Salt Lake City, Utah <br />7- ~~-99 <br />Date <br />Page 6 of 6 <br />