Laserfiche WebLink
UPLAND GRAVEL PIT NO. 1 <br />EXHIBIT L <br />Reclamation Costs <br />Revised 6/09/06 <br />ESTIMATED COST PER /ACRE <br />Scraper/Loader: Move overburden to mined out area - 16 hrs. @ $260.00...... $ 4,160.00 <br />Dozer/Loader: Smooth slopes of reclaimed area - 3 hrs. @ $150.00 ............... 450.00 <br />Scraper/Loader: Replace top soil on affected area - 6 hrs. @ $260.00 .............1,560.00 <br />Final grading for finished slope - 2 hrs. @ $120.00 ............................. 240.00 <br />Fertilizer application: 2 hrs. @ $125.00 ...................................... 250.00 <br />Fertilizer cost 64 lbs. @ $3.00 ............................................. 192.00 <br />Contour discing: 1 hr. @ $125.00 ......................................... 125.00 <br />Re-plant affected area w/seed broadcaster - 2 hrs. @ $125.00 ................... 250.00 <br />Harrowing & Dragging: 1 hr. @ $125.00 ..................................... 125,00 <br />Certified seed mix for non-irrigated rangeland - 23 Lb. @ $20.00 .................. 460.00 <br />Broadcast weed free grass hay mulch: 1 hr. @ $125.00 ........................ 125.00 <br />Cost of hay: 2 Ton @ $95.00 ............................................. 190.00 <br />Rolled crimping of hay mulch: 1 hr. @ $125.00 ............................. 125.00 <br />Total Estimated Cost ............................... $ 8,252.00 <br />