<br />will be contouring overburden pile to
<br />2:1 slope max. @ 75 yd3/ft.
<br />Cover, 615,000 yd3 @ 0.35 217,875.00
<br />"Topsoil", 31,000 yd3 @ 0.35 10,850.00
<br />31,000 yd3 @ 0.60 ~ 18,600.00
<br />Seed, 45 ac. @ 100.00 4,500.00
<br />Dozed, 300,000 yd3 @ 0.35 105,000.00
<br />Spread, 225,000 yd3 @ 0.70 157,500.00
<br />Seeding, 25 ac. @ 100.00 2,500.00
<br />Dozed, 225,000 yd3 @ 0.35 78,75).00
<br />Spread, 170,000 .00 @ 0.70 119,00).00
<br />Seeding, 15 ac. @ 100.00 1,500.00
<br />C1 3 Calculated only on removed weathered
<br />material. Mining won't resume until
<br />2025+.
<br />Cover, 4,000 yd3 @ 0.60 2,900.00
<br />Seeding, 5 ac. @ 100.00 50D.00
<br />C2 3,9 Cover, 11,000 yd3 @ 0.70 7,700.00
<br />Dozed, 50,000 yd3 @ 0.35 17,50D.00
<br />Seeded, 17 ac. @ 100.00 1,700.00
<br />C3 9,5 2400' of weathered material removed.
<br />Rest not disturbed until 2035+
<br />Cover, 9,000 yd3 "topsoil" @ 0.60 5,400.00
<br />Seed, 11 ac. @ 100.00 1,100.00
<br />E1 1,2,3 Overburden pile grading on east side
<br />by dragline, 25,000 yd3 @ 0.25 6,25(1.00
<br />Cover, 50,000 yd3 @ 0.70 35,00(1.00
<br />Seeding, 85 ac. @ 100.00 8,50(1.00
<br />E2 3 Overburden piles dozed to 2:1 slope
<br />30,000 yd3 @ 0.35 10,50(1.00
<br />Cover, 7,500 yd3 @ 0.70 5,25(1.00
<br />Seeding, 12 ac. @ 100.00 1,20(1.00
<br />E3 3,9 Dozed, 50,000 yd3 @ 0.35 17,50[1.00
<br />Cover, 20,000 yd3 @ 0.70 19,00(1.00
<br />Seeding, 30 ac. @ 100.00 3,000.00
<br />E9 4,5 Bonded to approx. N 112,750
<br />Reclamation calculated to limit of
<br />bond.
<br />Dozed, 105,000 yd3 @ 0.35 36,756.00
<br />Cover, 30,000 yd3 @ 0.70 21,000.00
<br />Seeding, 58 ac. @ 100.00 5,80(.00
<br />TOTAL $1,004,38`_.00