My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-10-20_REVISION - M1977348 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977348
>
1992-10-20_REVISION - M1977348 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2021 6:13:20 AM
Creation date
11/22/2007 12:41:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977348
IBM Index Class Name
Revision
Doc Date
10/20/1992
Doc Name
APPLICATION FOR AMENDMENT MLR 77-348
From
Holnam
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r1 <br />~~ <br /> <br />EXHIBIT L <br />Costs have been estimated for the Boettcher quarry <br />area which is currently under bond. These reclamation costs <br />are calculated on the following basis: <br />1. Since the distances are short, normally under 100 <br />feet, the dozer work has been estimated at $0.35 <br />per cubic yard. <br />2. Scraper distances are also short in the quarry <br />reclamation, so costs of scraper moved material <br />have been estimated at $0.70 per cubic yard. <br />3. Dragline cost is estimated at $0.25 per cubic ya:cd <br />where the dragline must be used on the east side of <br />some of the overburden piles to remove material .in <br />order to lower the slope to 2:1 maximum. <br />9. Growth media or "topsoil" spreading has been <br />estimated at 50.60 per cubic yard per contractor <br />quote. <br />5. Seeding has been estimated on the successful <br />experience at the Portland quarry east of Canyon <br />City. The seed is broadcast and then cleated in <br />with a bulldozer. The seedings have been successful <br />and the cost has been less than 5100.00 per acre, <br />These estimates are based on the rate of $100.00 per <br />acre. <br />AREA SHEET I EM <br />Al 1,2 All pre-law except Si02 landfill. <br />Cover,100,000 yd3 @ 0.70 (250') <br />Seeding, 5 ac. @ 100.00 <br />- 1,2 Area on, and east <br />Area is graded, p <br />Cover, 4000 yd3 @ <br />Seeding, 26.6 ac. <br />A2 2,3 CKD cover, 15,000 <br />Seeding, 12 ac. @ <br />A3 3,9 Pre-law <br />n <br />of, CKD landfill. <br />srtially covered. <br />0.60 <br />@ 100.00 <br />yd3 @ 0.70 <br />100.00 <br />. A9 4 pre-law <br />AS 9,5 Bonded from N 111,900 to N 119,700, <br />only 9th cut post-law. Reclamation <br />29 <br />COST <br />S 70,000.00 <br />506.00 <br />2,400.00 <br />2,660.00 <br />10,500.00 <br />1,200.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.