<br />• already been removed, cannot be started until the E-band <br />quarries to the east have been quarried out, filled with CKD <br />and covered. Then the haul road can be rebuilt on the E-band <br />CKD cover, the quarry power line moved, and sufficient space <br />opened up for overburden stripping. Even then, C-band mining <br />cannot begin immediately because the E-band operation must be <br />far enough ahead to make it economical to move a fairly large <br />section of road and power line so that the C-band stripping <br />operation can move for an economical period of time. The <br />Time Line shows the C1 operation starting in the year 2025. <br />At such a distance in the future, it is futile to speculate <br />just what the C-band quarry configuration will be like, so it <br />has not been included in the mining plan. <br />Since the C-band has been disturbed by the removal of the <br />weathered material, it is under bond, and will remain so, <br />until it is mined and reclaimed. Reclamation cost estimates <br />have been given for reclamation of the C-bands as they <br />currently exist with just the weathered material removed. <br />At the close of the quarrying operation, reclamation will be <br />completed on the area from the end of the CKD fill northw,~rd. <br />This area will include portions of the A-, C-, and E-band:. <br />• <br />18 <br />