Laserfiche WebLink
<br />Permit Page No(s)f <br />Section Maps Changes B Comments <br />4.8.1.2 4-174 to 4-174aa Culvert Table 4.8-1 is updated to reflect PR-5 changes. Page 4-174aa removed. <br /> Map M51 This 400 scale Drainage and Sediment Control map series updated to <br /> reflect PR-5 projections (3 sheets). <br />4.8.1.4 4-184 Permit term dates and number of ponds updated. <br /> 4-186a Sediment ponds table (Table 4.8-6, page 3) updated for PR-5. <br />4.8.1.5a 4-222gg NPDES sites table (Table 4.8-8b) updated for PR-5. <br />4.8.2 4-223 Reference to Appendix W updated to include annual reports through "the <br /> present " <br />4.8.2.2 4-225 Dewater wells discussion updated for PR-5. <br /> 4-226 Date reference removed for projected drawdown one mile from the pit. <br />4.8.2.2a 4-226c & 4-226d Groundwater inflow section updated for PR-5. <br />4.8.3.2 4-238a Discussion of disturbed Flume Gulch springs updated. <br />4.8.5 Map M52 This 1,000 scale hydrology monitoring sites map updated. <br />4.8.5.1 4-240 Table 4.8-11 updated to revise footnotes. <br /> 4-241a Flume Gulch disturbance discussion updated. <br />4.8.7 4-248a Update springs discussion to include 99-2 and 99-3 springs. <br />4.9.4 4-261 & 4-262 These topsoil balance tables (Tables 4.9-3 and 4.9-4) updated for new permit <br /> term. <br />3 <br />