Laserfiche WebLink
<br />Mr. Thomsen - 2 - November 14, 1991 <br />3) Representative cross-sections of main pit areas, showing both the <br />existing and proposed configurations. <br />4) The total acreage that would need to be top soiled and seeded. <br />5) Identify the location of all processed material stockpiles, topsoil <br />stockpiles and overburden stockpiles that will be on location at any <br />given time, and include their current and proposed maximum volumes. <br />The above items should be provided to the Division before we can proceed with <br />the approval of the technical revision. The Decision date for the technical <br />revision is November 29, 1991. Given the time constraint the Division will be <br />glad to extend the due date upon request. <br />If you have additional questions or concerns please call. <br />Sincerely, <br />Berhan Keffelew <br />Reclamation Specialist <br />BK/lac <br />9467E <br />