My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV100526
DRMS
>
Back File Migration
>
Revision
>
REV100526
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:11:00 AM
Creation date
11/22/2007 12:36:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
1/28/2000
Doc Name
SUPPLEMENTARY ADEQUACY REVIEW PR-05 NEW HORIZON MINE 2 PN C-81-008
From
DMG
To
WESTERN FUELS -COLORADO
Type & Sequence
PR5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^ • • III I II' II I II IIII'II <br />i <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />7 313 Sherman 51., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />F,4x: U03) 832.8105 <br />January 28, 2000 <br />Western Fuels-Colorado <br />~~ <br />D I V{ S l O N O F <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAF ETY <br />Ross Gubka, PE Bill Owens <br />P.O. Box 628 Governor <br />Nucla, CO 81424 Greg E. watcher <br /> E.ecmive Dvenor <br />Re: Su lementa Ade uac Review PR-OS New Horizon Mine 2 Permit No. C-81-008 <br />PP r'J" q y + + + Michael B long <br />Dwrslon Director <br />Dear Mc Gubka: <br />The Division has completed the remainder of the adequacy review of your recent permit revision to include <br />comments on surface water, roads, blasting and the-worst case bonding scenario. <br />The following issues will require additional information. correction or action. If any of the issues will require an <br />extended period of time before a response can be submitted, please hold those items in abeyance and submit the <br />other actions in a timely manner. <br />Section 2.05.3 Operation Plan: Permit Area <br />Page 2.05.3-3 Coal Processing and Non-Coal Processing Wastes; please insert a statement in this section <br />concerning the possibility the power company may install a ctvsher/breaker facility and will want to place the <br />reject material back into an open pit for disposal. <br />Pages 2.05.3-7, 8 Is [he addendum for the increased bond for the expanded pit width still viable or necessary? <br />Section 2.05.3(3) Mine Facilities <br />Pages 2.05.3(3)-5-~8 Sedimentation Ponds need to be generically revised to include ponds 8 through 13, and the <br />references to the removal of pond 7 should be deleted. <br />Section 2.05.3(3)-10 Amended Area Mine Facilities <br />Page ]0~ Last sentence $ G. Insert "...competent material and compacted to the same standards as the dnm <br />foundation. <br />Page 10-5 $ 2, delete the word "very" in second sentence, and delete the entire sentence " Ort[y after the pit <br />water is clear, will it ... <br />Page 10-I8 $ 1, second sentence, delete in the sentence ..."storage volume needed, therefore the volume hill he <br />routed through the spillway. <br />Page 10-82 last $, change ... "1.33 inches is very thick ... with "is resistant to r.•enther and wear and r.•i1l remnirt <br />flexible. <br />
The URL can be used to link to this page
Your browser does not support the video tag.