Laserfiche WebLink
S <br />Third Adequacy Review-TR X63 <br />July 6, 1993 <br />be removed from this exhibit. <br />required. <br />3. No further response is required. <br />4. No further response is required. <br />8.0 MONITORING <br />Page 3 <br />No further response is <br />1. Figure LWP-020 should be incorporated into Exhibit 51. The <br />table of contents should be updated. <br />9.0 RECLAMATION <br />1. An additional statement included in WECC's adequacy response <br />letter dated May 1986 states that the top of the pile will be <br />blocked by vehicular traffic upon completion of reclamation <br />operations by placing a berm or rock barrier across access <br />points. This commitment of blocking vehicular access to the <br />top of the pile should be included in this section as well. <br />2. As Technical Revision No. 53, approved a variance to Rule <br />4.10.4(5), the bond has been adequately estimated using 18-24" <br />of cover for the refuse pile. No further response is <br />required. <br />APPENDICES <br />1. No further response is required. <br />2. The baseline well quality data for wells associated with the <br />refuse pile will be added to Appendix I. No further response <br />is required. <br />3. No further response is required. <br />REVISED PERMIT PAGES <br />1. Stipulation No. 48 was added to the permit upon approval of <br />Minor Revision No. 94 (Hear gob), which requires the submittal <br />of revised section 2.05 of the permit document following <br />approval of Technical Revision No. 64. <br />