My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV100490
DRMS
>
Back File Migration
>
Revision
>
REV100490
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:10:58 AM
Creation date
11/22/2007 12:36:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
7/6/1993
Doc Name
THIRD ADEQUACY REVIEW TR 63 LOWER REFUSE PILE RECONFIGURATION WEST ELK MINE FN C-80-007
From
DMG
To
MOUNTAIN COAL CO
Type & Sequence
TR63
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Third Adequacy Review-TR #63 <br />July 6, 1993 <br />6.0 SURFACE HYDROLOGY <br />Page 2 <br />1. Page 23 has not been corrected to specify that ditches and <br />diversions were designed for the 100 year, 24 hour storm <br />event. Please provide this revised page. <br />2. No further response is required. <br />3. The clarification of the location of the ditches is helpful. <br />As there is currently no ditches named D6-3 and D6-4, the <br />associated designs for these ditches and locations on Map 54 <br />should be included in the review of Technical Revision No. 64. <br />4. As this question deals with mine site hydrology, it will be <br />resolved during Technical Revision No. 64. <br />5. The revised paragraph describing MB-6 is adequate at this <br />time; however, this issue must be resolved during Technical <br />Revision No. 64. This is necessary until the redesign of MB-6 <br />is implemented. No further response is necessary at this <br />time. <br />6. As this questions deals with mine site hydrology, it will be <br />resolved during Technical Revision No. 64. <br />7. The paragraph to include the riprap gradation information is <br />acceptable. No further response is required. <br />8. The verification from Envirocon, which states the diversion <br />berm will adequately divert the runoff from the 100-year, 24- <br />hour event should be incorporated into Exhibit 51. The table <br />of contents should be updated. <br />9. The paragraph which commits to maintaining positive drainage <br />on the south side of the refuse pile is adequate. No further <br />response is required. <br />10. Ditch D6-4 should be shown on Map 54 and designs should be <br />provided. As this request deals with mine site hydrology, it <br />will be resolved during Technical Revision No. 64. <br />7.0 ROADS <br />1. Figure LWP-O15A will be incorporated into Appendix M. No <br />further response is required. <br />2. Figure LWP-019, "Plan and Profile sheet and Cross Sections, <br />Temporary Realignment of Sylvester Gulch Road", will be <br />incorporated into Appendix M. The other Figure LWP-019 will <br />
The URL can be used to link to this page
Your browser does not support the video tag.