Laserfiche WebLink
17. Copies of the written notice to seek release to parties identified in <br />Rule 3.03.2(1). <br />RESPONSE: Section 2 contains copies of the letters to the appropriate <br />parties notifying them of the intention to seek Phase I Bond Release. <br />18. Copy of newspaper advertisement. <br />RESPONSE: Section 3 contains a copy of the newspaper advertisement which <br />will be published for four successive weeks in the Northwest Colorado <br />Hayden Valley Press. <br />B. REQUIREMENTS SPECIFIC TO PHASE I BOND RELEASE <br />1. An as-built, post-mining topography map showing the regraded contours. <br />RESPONSE: Arrangements have been made to have the mine flown for the <br />development of an as-built, post-mining topography map during late <br />September. The map will be submitted to the Division as soon as it is <br />completed. <br />2. Certified cross-sections of backfilled and graded area <br />(representative). <br />' RESPONSE: Exhibit C in Section 5 shows three certified cross sections <br />which compare as-built topography to approved post mining design. The <br />' locations and number of cross-sections are those agreed upon by Cathy <br />Bege,j of the Division on October 3, 1986, at a meeting with Yampa Mining <br />' Co. and H-G Coal Co. at the mine offices. As shown by the cross-sections, <br />the as-built reclaimed topography very closely depicts the approved post <br />mining design with only minor insignificant differences. <br />3. Documentation that drainages have been reestablished including <br />' drainage profiles. <br />3253h/ <br />(3) <br />