Laserfiche WebLink
Colorado Division of Minerals and Geology <br />_________________________________________ <br />ESTIMATING FORM - SCRAPER WORK <br />TASK NO. 2 PREP. BY: JD PERMIT NO. M-85-093 <br />__"_______ ________ __________ <br />DATE 09/19/9"/ FILENAME: M093-2 MINE: Red Canyon Qua [[y <br />PERMIT ACTION Phased Recla mataon <br />____________________________________________________ <br />TASK DESCRIPTION Replace Growth Medium on Quarry Floor <br />HOURLY EQUIPMENT COSTS: <br />______________________ Single, Double or Triple <br />County: FREMONT Labor Zone 1 Shrfts S <br />Equ ipmenc Descriptions <br />Scraper team make-up CAT 623E with BOPS cab <br />___________________________________________ <br />Road na int. - Grader N/A <br />- Water T.: N/A <br />_____________________"__________"__________ <br />Scraper Team Road Maintenance <br />Scraper Dozer ls) Grader wa[er truck <br />Equipmen[ Filename :623 E-ftOP 0 N/A N/A <br />________ ________ _________ _____"___ <br />U[iliza[ion on job: 100k N/A N/A N/A <br />________ ________ _________ _________ <br />Cost Breakdown: <br />Ownership cost/hr: $93.19 N/A N/A N/A <br />Operacr ng cost/hr: 5]3.93 N/A N/A N/A <br />Operator cos[/hr: $23.13 N/A N/A N/A <br />Vnit subtotals: $190.25 <br />________ N/A <br />________ N/A <br />_________ N/A <br />_________ <br />Scraper [eam su b[o[a1 5190.25 Maint. sub[otal N/A <br />To[al Work Team Cost/Hr: $190.25 <br />MATERIAL QUANTITIES: <br />Beg. <br />Volume: 41629 CCY <br />Cu.Yd. ------""' Swell Loose <br />Volume: 41,629 CCY Fac[or: 1.125 Volume: 46,820 LCY <br />Source of quantity Cake-off: Calculation <br />___________________________________________ <br />Source of est. swell factor: Program <br />___________________________________________ <br />