My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV100166
DRMS
>
Back File Migration
>
Revision
>
REV100166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:10:38 AM
Creation date
11/22/2007 12:33:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985043
IBM Index Class Name
Revision
Doc Date
7/14/1997
Doc Name
RECLAMATION COST SUMMARY FORM
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck Cycle Time Sheet 3 of 3 <br />________________ <br />Exchange = 0.70 min. Adj. for altitude = 0.]0 min. <br />Load = 1.400 mrn. = 1.40 m1n. <br />Maneuver 6 dump = 1.20 min. = 1.20 min. <br />Travel Time (haul ~ return): <br />Road cond. descr.: Frrm, smooth, rolling dxrc/lt. surfaced road, ma incained <br />_____________________________________________________________ <br />Haul route <br />Road Length Grade Rolling Total Ve locicy Travel time <br />seg. b (ft) res.(}) res. (}1 res.(}i (fpml (m inl <br />1 700 30.00 3.00 77.00 237 7.01 <br />Haul time = 3.01 mrn. <br />Return route ------ <br />1 700 -30.00 J.00 -2].00 105] ~ 0.73 <br />~lsc s last seg. adj. for accel./tle cel. Return [rme = 0 .73 min. <br /> Total T wck ycle Time = 7 .04 min. <br />Loader Unic Prod.= 390.00 <br />_________ LCY/Hr - Adj . for efficiency= 323 <br />_____ .70 <br />___ LCY/Hr <br />Truck Uni[ Prod.= 116.38 <br />_________ LCY/Hr - Adz . for efficiency= 96 <br />_____ .60 <br />___ LCY/Hr <br />Optimal number of trucks per loading unit 3 <br />Selected number of trucks per loading umt 3 <br /> Hourly truck team production 289 .80 LCY/Hr <br />Net Hourly Truck/Loader Team Production 289 .80 LCY/Hr <br />Net Hourly Mu lc rp le T/L Team Production 289 .BD LCY/Hr <br />SOB COST: <br />Fleet size 1 <br />________ T/L Team (sl Total Job Time: 57 <br />______ .62 <br />___ Hours <br />Unit Cose $0.854 <br />________ /LCY Total Job Cose: <br />_ $14, <br />______ 258 <br />___ <br />
The URL can be used to link to this page
Your browser does not support the video tag.