Laserfiche WebLink
Truck Cycle Time Sheet 3 of 3 <br />________________ <br />Exchange = 0.70 min. Adj. for altitude = 0.]0 min. <br />Load = 1.400 mrn. = 1.40 m1n. <br />Maneuver 6 dump = 1.20 min. = 1.20 min. <br />Travel Time (haul ~ return): <br />Road cond. descr.: Frrm, smooth, rolling dxrc/lt. surfaced road, ma incained <br />_____________________________________________________________ <br />Haul route <br />Road Length Grade Rolling Total Ve locicy Travel time <br />seg. b (ft) res.(}) res. (}1 res.(}i (fpml (m inl <br />1 700 30.00 3.00 77.00 237 7.01 <br />Haul time = 3.01 mrn. <br />Return route ------ <br />1 700 -30.00 J.00 -2].00 105] ~ 0.73 <br />~lsc s last seg. adj. for accel./tle cel. Return [rme = 0 .73 min. <br /> Total T wck ycle Time = 7 .04 min. <br />Loader Unic Prod.= 390.00 <br />_________ LCY/Hr - Adj . for efficiency= 323 <br />_____ .70 <br />___ LCY/Hr <br />Truck Uni[ Prod.= 116.38 <br />_________ LCY/Hr - Adz . for efficiency= 96 <br />_____ .60 <br />___ LCY/Hr <br />Optimal number of trucks per loading unit 3 <br />Selected number of trucks per loading umt 3 <br /> Hourly truck team production 289 .80 LCY/Hr <br />Net Hourly Truck/Loader Team Production 289 .80 LCY/Hr <br />Net Hourly Mu lc rp le T/L Team Production 289 .BD LCY/Hr <br />SOB COST: <br />Fleet size 1 <br />________ T/L Team (sl Total Job Time: 57 <br />______ .62 <br />___ Hours <br />Unit Cose $0.854 <br />________ /LCY Total Job Cose: <br />_ $14, <br />______ 258 <br />___ <br />