My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV100166
DRMS
>
Back File Migration
>
Revision
>
REV100166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:10:38 AM
Creation date
11/22/2007 12:33:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985043
IBM Index Class Name
Revision
Doc Date
7/14/1997
Doc Name
RECLAMATION COST SUMMARY FORM
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• ! <br />ROADABLE EQUIPMENT: <br />-" "--" "'--'-" Total Eqp. Fleer Size Haul Trip Return Trip <br />Machine Description Cost/hr (no. hauled) Cosc/hr Cost/hr <br />sheet 2 of 2 <br />Subtotals 50.00 50.00 <br />MOB/DEMOB SUPPORT EQUIPMENT: --~~~ ~~ ~~ ~~ <br />'--"--~~"------"----"'---" Weight Ownership Haul Rig Fleet Size Haul Trip Re[u rn Trip DOT Permit <br />Non-Roadable Eqp. Descriptron (cons) Cos[/hr Cost/hr Ino. hauled) Cos[/hr Cost/hr Cost/ea <br /> Subto[a is 50.00 <br />_________ 50.00 $0.00 <br />_________ _________ <br />Total Eqp. Fleet Sue Haul Trrp Return Trip <br />Roadable Eqp. Description Cosc/hr Ino. hauled) Cost/hr Cost/hr <br />Subtotals 50.00 $0.00 <br />_________ _________ <br />EQUIPMENT HAUL DISTANCE fi TIME <br />Nearest ma7 or city or [nvn within project area region: Canon City <br />Total one way travel drscance 30.0 mrles. Average travel speed = 40.00 mph. <br />Job Time - Non Roadable Equip.= 1.00 hours load Roadable Equip.= N/A hours load <br />0.75 hours haul 0.75 hours haul <br />1.00 hours unload N/A hours unload <br />0.75 hours recu rn 0.75 hou ra return <br />JOB COST Total Mob/Demob Cost $2,]49.69 <br />NOTE: Non-roadable equipment (haul rig required to transport) mob/demob costs based on 2 round [rips, each trip <br />consisting of a one-way loaded haul and a one-vay empty return. Roadable equipment Ino haul rig required) <br />costs based on one round [rip. Colorado DOT requires special permrts for oversize equipment on certain <br />specified road segments vichin the State. Separate permits are required for each rig on each loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of ove rs rzei are also required Eor oversize <br />equipment hauling, and loading/unl oa dinq times must be increased substantially for equipment which must be <br />pa rtrally dismantled for transport and re-assembled ac the job site. Costs Eor lifting equipment and other <br />support eqU ipment needed for this work should be included in the mob/demob costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.